Earned Value Road Problem

 Route 93 is planned to be re-paved. The entire route from the I90-I93 interchange to the Route 128/I93 interchange is 7.7 miles. The plan is for 0.77
miles to be complete each month for 10 months. The estimated cost of the entire project is $1,470,000. The following table represents the status of the
project at the end of month 4: Calculate the cumulative planned and earned value, as well as the cumulative actual costs. Calculate the CPI and SPI. Plot
the quantities. Estimate the final cost and schedule Give a brief analysis of the project. I will email you the table