The report should contain the following tasks 1. Work breakdown structure for the project selected based on the students number. Here the students have to prepare a comprehensive list of all the activities of the project. [Weightage: 25%] 2. Schedule the activities as per the logic applied. The scheduling has to be done in GANTTER using proper logical sequence for all the activities. All possible combinations of logical sequence can be used to get the optimized time schedule. The entire schedule has to be printed and submitted in the report. [Weightage: 35%] 3. Identify the resources and prepare an online resource chart using GANTTER. This table has to be printed from GANTTER and submitted. All possible resources – Men, Machinery, Materials and Money has to be incorporated along with their anticipated cost. [Weightage: 25%] 4. Presentation Slides. The student has to defend their work at the

The report should contain the following tasks

1. Work breakdown structure for the project selected based on the students number. Here the students have to prepare a comprehensive list of all the activities of the project. [Weightage: 25%]

2. Schedule the activities as per the logic applied. The scheduling has to be done in GANTTER using proper logical sequence for all the activities. All possible combinations of logical sequence can be used to get the optimized time schedule. The entire schedule has to be printed and submitted in the report. [Weightage: 35%]

3. Identify the resources and prepare an online resource chart using GANTTER. This table has to be printed from GANTTER and submitted. All possible resources – Men, Machinery, Materials and Money has to be incorporated along with their anticipated cost. [Weightage: 25%]

4. Presentation Slides. The student has to defend their work at the